State Construction Permits Program
CA project permit and annual permit requirements for excavations, tanks, and structures.
Built from
T8 CCR §341 / State-specific
- Conversational intake with Guy — no blank forms
- Citations on every page — defensible at inspection
- Delivered as a polished PDF in minutes
- 10 days of free edits included
What’s in this document
Every section is written to match the regulatory citation — not a generic template. Your answers to Guy shape the trade-specific content.
Sections covered
- 1
Regulated scope
Exact tasks, equipment, or substances the program governs — with regulatory citations.
- 2
Competent person
Designation, qualifications, and authority of the competent person required for this work.
- 3
Pre-work planning
Site assessment, permits, and the documentation required before work starts.
- 4
Controls & monitoring
Required controls (engineering, work practice, PPE) and exposure or condition monitoring procedures.
- 5
Training & records
Trade-specific training elements, certification, and required records.
What you walk away with
- A trade-specific written plan calibrated to your scope of work
- Pre-built competent-person and inspection forms inside the document
- Citations on every page — defensible at OSHA inspection
- Format
- Pages
- 20–35
- Intake
- 10–20 min
- Citations
- On every page
Regulatory basis
Built from these citations
Every section in this document maps to a published regulation. The citation appears on every page so an inspector can verify scope without asking you.
Cal/OSHA — Title 8 CCR
T8 CCR §341
Authoritative source used to draft this document.
Regulatory authority
State-specific
Authoritative source used to draft this document.
Where this document applies
This is a California-specific document. It is built from California regulations and is not required in other states. Most other states do not have an equivalent standard, so this document is generally not applicable outside California.
Not sure which version you need?
Guy asks for your jurisdiction during intake and configures the document automatically. You don’t have to know the right answer up front.
Frequently asked questions
Common questions about this document, intake, and updates.
- CA project permit and annual permit requirements for excavations, tanks, and structures. The document is built from T8 CCR §341 / State-specific and includes every written element OSHA expects to see during an inspection. The PDF runs 20–35 pages depending on your trade and state.
Commonly bought together
Contractors who buy this document typically also need these.
- specialty$129
Silica Exposure Control Plan
Task-specific controls per Table 1, medical surveillance, respirator requirements.
29 CFR 1926.1153 / 29 CFR 1910.1053
- specialty$129
Confined Space Program
Permit system, atmospheric testing, attendant duties, rescue procedures.
29 CFR 1910.146 / 29 CFR 1926.1204
- specialty$129
Excavation and Trenching Safety Plan
Soil classification, protective systems, competent person, daily inspection.
29 CFR 1926 Subpart P